Delkor Global - Delkor Delivers for Osisko's Flagship Gold Property

Please choose your language   

Contact Us

IT PAYS TO TALK TO A SPECIALIST

Delkor Delivers for Osisko's Flagship Gold Property

Posted Febuary 2011

Canadian Malartic is the largest gold reserve in Canada and is scheduled to be in production by mid 2011. Delkor is proud to have supplied the Thickeners and Belt Linear Screens for this project.  Osisko has installed six Delkor Belt Linear Screens (2 x 32m2 for Trash, 2 x 20m2 for Carbon Safety, and 2 x 9m2 for Loaded Carbon) and 2 x 65m High Rate Thickeners (Leach Feed & Tailings).

These Delkor Belt Screens are among the largest of this type supplied in the industry, and were selected based on their superior trash removal and carbon dewatering capabilities.

The Thickeners include Delkor’s unique feedwell design that allows for higher dilution volumes and lower flocculant consumption.  Some of the design considerations for low temperature Thickener operation include insulated doghouses, hydraulic fluid heaters and low temperature hydraulic fluid.  The equipment was recently installed with Delkor supervision on-site and commissioning is expected to take place in early 2011.  Delkor looks forward to the start-up and success of Osisko’s Malactic gold property.

Thickener aaa Trash Screens
 65m Diameter Thickener     2 x 32m Trash Screens



Download: Delkor Delivers for Osisko's Flagship Gold Property


Related Articles

  • Delkor Thickener Seminar 2010

    Delkor’s Thickener Centre of Excellence seminar was held in Perth, Australia last year from the 1st – 5th November 2010. Delkor personnel from Australia, South Africa, India, Chile, China and Canada attended the annual seminar.

    read more

  • Large Thickener Contract for Iron Ore Tailings

    Delkor India has been awarded a significant thickener contract by Essar Projects a $15 billion Global Corporation, the third largest in India, with interests in Steel, Oil, Power, Telecom, Shipping and construction.

    read more

  • Hidden Valley DeBottlenecking Project Trash Screen

    Delkor Australia has supplied the 25m2 Delkor Belt Linear Screen to Morobe Mining Joint Venture (Newcrest & Harmony Gold) for their Hidden Valley De-Bottlenecking Project in Papua New Guinea.

    read more

  • Large Thickener supply for Morocco

    Design and engineering of thickeners and tanks are on schedule for a contract awarded to Delkor India by Office Chérifien des Phosphates (OCP), Morocco. The contract covers fabrication, supply and installation of thickeners for OCP’s Khouribga mines.

    read more

  • Pascua Lama Project

    Delkor has been awarded a significant contract by Barrick for the supply of 14 High Rate Thickeners and Clarifiers on the Pascua Lama Project that straddles the Chile / Argentina border and is located in the high Andes at 4000m AMSL.

    read more

  • Sepon Copper Project, Laos

    After having a 14 month project suspension during which the mine was sold to the Chinese Minmetals Group – the Sepon Expansion Project has been re-started.

    read more