Delkor Global - Installation

Please choose your language   

Contact Us

IT PAYS TO TALK TO A SPECIALIST

Installation

Post Start up Process and Maintenance Optimisation and Training
We are always on call to assist with erection supervision, installation check-outs, and process start-ups. Our qualified and experienced engineers are available to discuss your requirements, make recommendations, suggest solutions and provide on site training. We also provide maintenance services for all equipment to improve equipment performance, reliability and prolong equipment life spans.
 
El Peñon, 82m2 Belt Filter, Gold Washing and Dewatering, Chile, Installation aaaa High Rate Thickener 2 x 100 dia, Minera Valle Central, Chile, Installation
 El Peñon, 82m2 Belt Filter, Gold Washing and Dewatering, Chile, Installation   High Rate Thickener 2 x 100 dia, Minera Valle Central, Chile, Installation
High Rate Thickener 2 x 65m dia, Osisko, Canada   BQR Flotation Cell, Installation
High Rate Thickener 2 x 65m dia, Osisko, Canada, Installation   BQR Flotation Cell, Installation

Delkor News

  • Delkor Thickener Seminar 2010

    Delkor’s Thickener Centre of Excellence seminar was held in Perth, Australia last year from the 1st – 5th November 2010. Delkor personnel from Australia, South Africa, India, Chile, China and Canada attended the annual seminar.

    read more

  • Belt Filters for Stratford Coal Expansion Project

    Delkor Australia has supplied one 122 m2 Delkor belt filter in a contract from Stratford Coal for its recent “Coal Handling and Preparation Plant” upgrade near Gloucester, New South Wales Australia. The contract was awarded in September 2010, with commissioning completed in June 2011.

    read more

  • Flotation: Advantage Circular Cells

    Circular cells reduce the amount of dead volume when compared to square cells. This enables a much higher effective pulp volume, hence increasing the effective energy input into the flotation cell.

    read more

  • Large Thickener Contract for Iron Ore Tailings

    Delkor India has been awarded a significant thickener contract by Essar Projects a $15 billion Global Corporation, the third largest in India, with interests in Steel, Oil, Power, Telecom, Shipping and construction.

    read more

  • Large Thickener supply for Morocco

    Design and engineering of thickeners and tanks are on schedule for a contract awarded to Delkor India by Office Chérifien des Phosphates (OCP), Morocco. The contract covers fabrication, supply and installation of thickeners for OCP’s Khouribga mines.

    read more

  • Delkor Delivers for Osisko's Flagship Gold Property

    Osisko Mining Corporation is currently developing their flagship Canadian Malartic gold property, located immediately south of the town of Malartic in Quebec, Canada.

    read more

  • Hidden Valley DeBottlenecking Project Trash Screen

    Delkor Australia has supplied the 25m2 Delkor Belt Linear Screen to Morobe Mining Joint Venture (Newcrest & Harmony Gold) for their Hidden Valley De-Bottlenecking Project in Papua New Guinea.

    read more

  • Horizontal Belt Filters for Solomon Iron Ore Project

    Delkor Australia is supplying five 158 m2 Delkor Horizontal Belt Filters, inclusive of ancillaries, in a contract from Fortescue Metals Group (FMG) for its Solomon Project in Pilbara, Western Australia. The contract was awarded in July 2011, with commissioning due in April 2012.

    read more

  • Delkor Floats Above the Rest in Australia

    Delkor has extended its product line offering into Australia by supplying Xstrata Nickel Australasia with technologically advanced flotation cells.

    read more

  • Tenova acquires Bateman Engineering N.V.

    Tenova, a worldwide supplier of advanced technologies and equipment for the iron & steel and mining industries, announces today the acquisition of Bateman Engineering N.V., a leading equipment supplier and engineering house for the mining industry.

    read more