Please choose your language
IT PAYS TO TALK TO A SPECIALIST
Clarification
Click Here
Other Equipment Categories Filtration | Sedimentation | Screening | Flotation | Flocculant Plants
The Delkor Pinned Bed Clarifier is a unique process for hydrometallurgical plants where solution clarity is important. read more
The Delkor Clarifier is typically used when overflow clarity is a critical issue. With water being such a scarce resource in many of the mining areas around the world, the Delkor Clarifier is widely used to maximize this commodity. read more
Design and engineering of thickeners and tanks are on schedule for a contract awarded to Delkor India by Office Chérifien des Phosphates (OCP), Morocco. The contract covers fabrication, supply and installation of thickeners for OCP’s Khouribga mines.
read more
Delkor India has been awarded a significant thickener contract by Essar Projects a $15 billion Global Corporation, the third largest in India, with interests in Steel, Oil, Power, Telecom, Shipping and construction.
Delkor’s Thickener Centre of Excellence seminar was held in Perth, Australia last year from the 1st – 5th November 2010. Delkor personnel from Australia, South Africa, India, Chile, China and Canada attended the annual seminar.
Delkor has been awarded a significant contract by Barrick for the supply of 14 High Rate Thickeners and Clarifiers on the Pascua Lama Project that straddles the Chile / Argentina border and is located in the high Andes at 4000m AMSL.
Delkor Australia has supplied one 122 m2 Delkor belt filter in a contract from Stratford Coal for its recent “Coal Handling and Preparation Plant” upgrade near Gloucester, New South Wales Australia. The contract was awarded in September 2010, with commissioning completed in June 2011.
Delkor Australia is supplying five 158 m2 Delkor Horizontal Belt Filters, inclusive of ancillaries, in a contract from Fortescue Metals Group (FMG) for its Solomon Project in Pilbara, Western Australia. The contract was awarded in July 2011, with commissioning due in April 2012.
Osisko Mining Corporation is currently developing their flagship Canadian Malartic gold property, located immediately south of the town of Malartic in Quebec, Canada.
Delkor Australia has supplied the 25m2 Delkor Belt Linear Screen to Morobe Mining Joint Venture (Newcrest & Harmony Gold) for their Hidden Valley De-Bottlenecking Project in Papua New Guinea.
Circular cells reduce the amount of dead volume when compared to square cells. This enables a much higher effective pulp volume, hence increasing the effective energy input into the flotation cell.
Tenova, a worldwide supplier of advanced technologies and equipment for the iron & steel and mining industries, announces today the acquisition of Bateman Engineering N.V., a leading equipment supplier and engineering house for the mining industry.
Delkor has extended its product line offering into Australia by supplying Xstrata Nickel Australasia with technologically advanced flotation cells.