Please choose your language
IT PAYS TO TALK TO A SPECIALIST
Sedimentation
Click Here
The Delkor High Rate Thickener is a proven performer in a variety of different applications – including minerals, industrial, chemical, water treatment and waste water industries. read more
The Delkor High Density Thickener was a result of clients requiring higher underflow densities and improved water recoveries. read more
The Delkor Paste Thickener takes all the knowledge and experience of over 30 years providing thickeners for the mining industry and applies it to the extreme mechanical and process requirements needed when dealing with high rheology underflows. read more
The Delkor Ultrasep concept permits a very high allowable rise rate in the thickener and thus reduces the required thickening area significantly, affording a far more cost-effective thickening solution. read more
The Delkor Conventional Thickener is often used where the use of flocculant is problematic or expensive. The large area and low rise rates allow for particles to settle with little or no flocculant addition. read more
Design and engineering of thickeners and tanks are on schedule for a contract awarded to Delkor India by Office Chérifien des Phosphates (OCP), Morocco. The contract covers fabrication, supply and installation of thickeners for OCP’s Khouribga mines.
read more
Delkor India has been awarded a significant thickener contract by Essar Projects a $15 billion Global Corporation, the third largest in India, with interests in Steel, Oil, Power, Telecom, Shipping and construction.
Osisko Mining Corporation is currently developing their flagship Canadian Malartic gold property, located immediately south of the town of Malartic in Quebec, Canada.
Delkor’s Thickener Centre of Excellence seminar was held in Perth, Australia last year from the 1st – 5th November 2010. Delkor personnel from Australia, South Africa, India, Chile, China and Canada attended the annual seminar.
Delkor has been awarded a significant contract by Barrick for the supply of 14 High Rate Thickeners and Clarifiers on the Pascua Lama Project that straddles the Chile / Argentina border and is located in the high Andes at 4000m AMSL.
After having a 14 month project suspension during which the mine was sold to the Chinese Minmetals Group – the Sepon Expansion Project has been re-started.
Tenova, a worldwide supplier of advanced technologies and equipment for the iron & steel and mining industries, announces today the acquisition of Bateman Engineering N.V., a leading equipment supplier and engineering house for the mining industry.
Delkor Australia has supplied the 25m2 Delkor Belt Linear Screen to Morobe Mining Joint Venture (Newcrest & Harmony Gold) for their Hidden Valley De-Bottlenecking Project in Papua New Guinea.
Delkor has extended its product line offering into Australia by supplying Xstrata Nickel Australasia with technologically advanced flotation cells.
Delkor Australia is supplying five 158 m2 Delkor Horizontal Belt Filters, inclusive of ancillaries, in a contract from Fortescue Metals Group (FMG) for its Solomon Project in Pilbara, Western Australia. The contract was awarded in July 2011, with commissioning due in April 2012.
Delkor Australia has supplied one 122 m2 Delkor belt filter in a contract from Stratford Coal for its recent “Coal Handling and Preparation Plant” upgrade near Gloucester, New South Wales Australia. The contract was awarded in September 2010, with commissioning completed in June 2011.
Circular cells reduce the amount of dead volume when compared to square cells. This enables a much higher effective pulp volume, hence increasing the effective energy input into the flotation cell.